Contents
Services provided
Recent projects
Project by Client Business Sector
Project construction content
Project index
Company Profile

Management Services:
FARCOURT LTD
Design
Design Services:
FARCOURT LTD
Site Services:
Operational Area:
Recent Projects
Fishergate Shopping Centre, Preston –
Liverpool Park Southway -
Chapel Quarter, Nottingham –
FARCOURT LTD
Client & Project History
| A380 Airbus | |
| Eurofighter | |
| Nimrod | |
| Hawk Trainer | |
| Acoustic Fatigue | |
| ELSI | |
| Sizemix | |
| Silver Plant | |
| Cereals Mill | |
| Loading Docks | |
| Incinerator | |
| Chapel Quarter | |
| Bishop's Field | |
| Superhub | |
| JJB Sports | |
| The Beacons | |
| Healthcare Centre | |
| Grosvenor Court | |
| Marks and Spencer | |
| Co-op Stores | |
| Morton Park | |
| Chatsworth Park | |
| Jackson's Wharf | |
| Gunrun | Soccerdome |
| Deepdale Pavilions | |
| Schools Programme: Nursery/Gymnasium English/Music Blocks |
FARCOURT LTD
Project Construction & Content
KEY
|
TYPE |
COM |
COMMERCIAL (NEW) |
|
IND |
INDUSTRIAL (NEW) |
|
|
PRO |
PROCESS (NEW) |
|
|
REF (IND) |
REFURBISHMENT, INDUSTRIAL |
|
|
REF (COM) |
REFURBISHMENT, COMMERCIAL |
|
|
DOM |
DOMESTIC (NEW) |
|
|
STRUCTURE |
STWK |
STRUCTURAL STEELWORK |
|
PC |
PRECAST CONCRETE & STEELDECK COMPOSITE |
|
|
RC |
REINFORCED CONCRETE |
|
|
BRWK |
MASONRY |
|
|
TIM |
TIMBER & TRUSSED RAFTER ROOFSCAPES |
|
|
CF |
COLDFORMED |
|
|
FOUNDATIONS |
CON |
MASS CONCRETE STRIPS & PADS |
|
RCON |
REINFORCED CONCRETE STRIPS & PADS |
|
|
PIL |
PILES |
|
|
BAS |
BASEMENTS |
|
|
RA |
RAFTS |
|
|
RET |
RETAINING WALLS |
| Projects by Construction Content | |||||||||||||
|
STRUCTURES |
FOUNDATIONS |
||||||||||||
|
PROJECT |
TYPE |
STWK |
PC |
RC |
BRWK |
TIM |
CF |
CON |
PIL |
B AS |
RA |
RET |
RCON |
| Chapel Quarter, Nottingham |
COM |   |   |   |   |   |   |   | |||||
| A380 Airbus, Chester |
IND |   |   |   |   |   |   | ||||||
|
Healthcare Centre, Sandbach |
COM |   |   |   |   |   |   |   | |||||
| BFD Site, York |
COM |
  |   |   |   |   |   |   |   | ||||
| Co-op Stores, Builth & various |
COM |
  |   |   |   |   |   |   |   | ||||
| Eurofighter, Warton |
REF (IND) |
  |   |   |   |   |   |   |   |   | |||
| Nimrod, Kinloss |
IND |
  |   |   |   |   |   |   |   |   |   | ||
| Hawk Trainer, Brough |
REF (IND) |
  |   |   |   |   |   | ||||||
| M & S, Manchester |
COM |
  |   |   |   |   |   |   | |||||
| Soccer Dome, Trafford Centre |
COM |
  |   |   |   |   |   |   | |||||
| Schools Programme, Wigan |
DOM |
  |   |   |   |   |   |   | |||||
| JJB Sports, Oldham |
COM |
  |   |   |   |   |   |   |   |   | |||
| Jackson’s Wharf, Castlefield |
COM |
  |   |   |   |   |   |   | |||||
| The Beacons, Warrington |
COM |
  |   |   |   |   |   |   |   | ||||
| Acoustic Fatigue, Warton |
IND |
  |   |   |   |   |   |   |   |   | |||
| Gun Run, East Manchester |
COM |
  |   |   |   |   |   |   | |||||
| Incinerator, Wrexham |   |   |   |   |   |   |   |   |   |   | |||
| ELSI, Beckton & Crossness |   |   |   |   |   |   |   | ||||||
| Grosvenor Court, Chester |
COM |
  |   |   |   |   |   |   |   | ||||
| Superhub, Manchester Airport |
COM |
  |   |   |   |   |   |   | |||||
| Sizemix Plant, Wrexham |
REF (IND) |
  |   |   |   |   |   |   | |||||
| Loading docks, Belper |
COM |   |   |   |   |   |   |   |   | ||||
| Silver Plant, Mobberley |   |   |   |   |   |   |   |   |   | ||||
| Cereals Mill, Trafford Park |   |   |   |   |   |   |   |   |   |   |   |   | |
| Morton Park, Darlington |
COM |
  |   |   |   |   | |||||||
| Chatsworth Park, Barrow |
COM |
  |   |   |   |   |   |   | |||||
| Deepdale Pavilions, Preston |
DOM |
  |   |   |   |   |   |   |   |   | |||
"
A" Shed hangar, Brough Acoustic Fatigue Facility, Warton Bishop’s Fields, YorkChecks to existing steelwork gantries and R.C bunkers, Daw Mill Colliery
Church, R.A.F. Leeming Co-op stores, Builth Wells East London Sludge Incineration projectsEuropean Fighter
Aircraft Hanger 302 refurbishment, Warton Aerodrome Feasibility proposals for process buildings, Derbyshire Fishergate Shopping Centre, Preston Gun-Run sports hall project, Miles Platting Hospital, Bradford Housing Development, PrestonJackson’s Wharf,
Public House & Restaurant, CastlefieldJJB Sports, Warehouse building, Manchester
Kiln project, Shap Fell Liverpool Park Southway Travel Interchange Loading dock facilities for warehouse complex, Belper (Thorntons) Manchester Airport Superhub Marks & Spencer store, Manchester Office block and portal frame warehousing, Cornbrook, Manchester Office Development, Grosvenor Court, Chester Paper mill, Florida, U.S.A. (Simon Holder) Preston Crown Courts Primary School buildings, WiganRepair works to RC framed process building, Trafford Park
School buildings, Cansfield Shopping development, Barrow in Furness (Shoprite) Shopping Centre, Blackpool Shopping mall complex, Darlington (Morrisons) Silver reclamation process plant extension, Mobberley Simulator Building, Kinloss Size mix and Chiller Process plant, Wrexham The Beacons Business Park, Warrington Trafford Centre soccer dome, Manchester Waste incinerator plant, Wrexham (Trinco) Y.M.C.A., Castlefield, Manchester
|
Project |
|
|
Farcourt Client |
Shepherd Gilmour, Manchester. |
|
Farcourt Deliverables |
Design development of steelwork frame; structural analysis and calculations; sketch scheme proposals |
|
Mother Client |
|
|
Project Value |
£35 million |
|
Development Purpose |
Major four-storey city centre retail development of 40 tenant units |
|
Details |
Steel frame; precast concrete diaphragm floors with braced stair cores; piled foundations |
|
Features |
|
|
Location |
Preston |
Previous
|
Project |
|
|
Farcourt Client |
Halcrow. |
|
Farcourt Deliverables |
Structural planning management of computer modelling; façade engineering development; collation of structural calculation sets |
|
Mother Client |
|
|
Project Value |
£18 million |
|
Development Purpose |
|
|
Details |
Public Concourse Building; pad and piled foundations. |
|
Features |
Steelwork frame multibay hybrid portals with curved rafters and intermediate tree columns; free waveform standing seam roof with glass curtain walling |
|
Location |
Liverpool Park Southway |
previous
|
Project |
Airbus A380 Project Skin Mill |
|
Farcourt Client |
Veryards Ltd., Manchester |
|
Farcourt Deliverables |
Steelwork design of High Bay 54m span deep lattice trusses, on full-height 914 UB columns on pad foundations |
|
Mother Client |
BAE Systems of Broughton. |
|
Project Value |
£17 million |
|
Development Purpose |
Production of full span aircraft wing components. |
|
Details |
|
|
Features |
Includes provision for 2 x 6.3-ton capacity cranes, supported off bottom boom of lattice trusses, operating in tandem lift mode, & 5 bay full height section of wall 40m long made removable to allow for wing access through side of building. |
|
Location |
Chester |
Previous
|
Project |
|
|
Farcourt Client |
W.S.P., Manchester |
|
Farcourt Deliverables |
Development of computer modelling. Forming structural design of main frame. Site problem resolution |
|
Mother Client |
|
|
Project Value |
£15 million |
|
Development Purpose |
Six-storey hotel, office and mixed commercial tenanted development with ground floor parking |
|
Details |
Suspended ground slabs, piled foundations |
|
Features |
Reinforced concrete frame with flat slab floor construction, designed with sway |
|
Location |
Nottingham |
Previous
|
Bishop's Fields Site, students' block |
|
|
Farcourt Client |
WSP Group, Manchester |
|
Farcourt Deliverables |
Design of steelwork frame for 570-bed Halls of Residence with ground floor shops, medical facilities, offices and Students' Union accommodation. |
|
Mother Client |
Keyland Developments |
|
Project Value |
£12 million |
|
Development Purpose |
Student Accommodation. |
|
Details |
Six- to eight-storey steelwork frame (approx. 1,200 tonnes) with precast concrete floors on piled foundations |
|
Features |
|
|
Location |
York |
Next
|
Project |
|
|
Farcourt Client |
WSP Group, Manchester |
|
Farcourt Deliverables |
Design of a small supermarket comprising 30m-span steel portal frame. Fully braced end bays. Foundations are traditional mass concrete strips and pads. Ground slabs are on solid. Approx. 50 tonnes of steelwork. |
|
Mother Client |
Co-operative Wholesale Society |
|
Project Value |
£0.75 million |
|
Development Purpose |
This store is part of an ongoing framework project of 30 developments nation-wide. |
|
Details |
|
|
Features |
Curved "Westok" beam rafters. |
|
Location |
Builth Wells |
Previous
|
Project |
|
|
Farcourt Client |
British Aerospace, Chorley |
|
Farcourt Deliverables |
Design of following parts of project: a) Roof strengthening of existing 70-metres span high bay lattice trusses to carry increased cranage capacity for aircraft production. b) Piled foundation works for mezzanine manufacturing area, including adaptations to existing reinforced concrete duct systems. |
|
Mother Client |
|
|
Project Value |
|
|
Development Purpose |
Refurbishment of existing hangar for new aircraft production. |
|
Details |
|
|
Features |
|
|
Location |
Warton Aerodrome |
Next
|
Project |
|
|
Farcourt Client |
B.A.e.C.S. |
|
Farcourt Deliverables |
Design of high bay portal frames for simulator area, evacuation trainer and computer hall/plant areas, plus two-storey office block of simple construction (trussed roof) & metal deck composite first floor. |
|
Mother Client |
R.A.F. |
|
Project Value |
£12 m |
|
Development Purpose |
R.A.F. Flight Training facility. |
|
Details |
|
|
Features |
|
|
Location |
Kinloss (Scotland). |
Previous
|
Project |
"A" Shed Hangar extension |
|
Farcourt Client |
B.A.e.C.S. |
|
Farcourt Deliverables |
Quality Assurance of B.A.e.C.S.’ own design and contractors’ proposals. Resolution of Site queries for project, comprising 2-storey steel frame, on piled foundations. |
|
Mother Client |
British Aerospace |
|
Project Value |
£4.5 m |
|
Development Purpose |
Despatch facility for Hawk Trainer production and 1st floor offices |
|
Details |
|
|
Features |
|
|
Location |
Brough, Yorkshire |
Back to Project Listing Previous
Next
|
Project |
Marks & Spencer flagship store |
|
Farcourt Client |
W.S.P., Manchester |
|
Farcourt Deliverables |
Checking fabricator’s end connection calculations for eight-storey heavy steel frame structure & two basement levels. |
|
Mother Client |
|
|
Project Value |
£85 m |
|
Development Purpose |
Commercial retail store |
|
Details |
|
|
Features |
|
|
Location |
Central Manchester |
Previous
Next
|
Project |
|
|
Farcourt Client |
W.S.P., Manchester |
|
Farcourt Deliverables |
Design of three-bay 36-metres span portal frame structure. Foundations are piled with all walls on suspended ground beams. Ground slabs on solid. |
|
Mother Client |
Bovis Europe |
|
Project Value |
£15 million |
|
Development Purpose |
Accommodation for 15 five-a-side soccer pitches, and swimming pool/sauna area. |
|
Details |
|
|
Features |
Integral 1st floor shopping, gymnasia, bar and plant room areas. |
|
Location |
Trafford Park, Manchester |
|
Cansfield High School |
|
|
Farcourt Client |
Metropolitan Wigan B.C. |
|
Farcourt Deliverables |
Design of new extension comprising trussed rafters on loadbearing walls on strip foundations. Steelwork trusses provided in performance studio. |
|
Mother Client |
|
|
Project Value |
£350,000 |
|
Development Purpose |
New English and Music blocks |
|
Details |
|
|
Features |
Light well over performance studio includes steelwork truss construction. |
|
Location |
Wigan |
Previous
(Cansfield High School) -
Next|
Project |
|
|
Farcourt Client |
Metropolitan Wigan B.C. |
|
Farcourt Deliverables |
Design of: Nursery: Trussed rafters on loadbearing masonry on strip foundations.Gymnasium: Flat top portal frame steelwork construction, strip foundations with non-loadbearing infill masonry panels. |
|
Mother Client |
|
|
Project Value |
£150,000 |
|
Development Purpose |
Provision of new Day Nursery & Gymnasium respectively |
|
Details |
|
|
Features |
|
|
Location |
Wigan |
Previous
Next
|
Project |
|
|
Farcourt Client |
White Young (Manchester) |
|
Farcourt Deliverables |
Principally involved with the provision of piled foundations and suspended ground floor beams and floor slabs. |
|
Mother Client |
JJB Sports |
|
Project Value |
£1.5 million |
|
Development Purpose |
High Bay Warehouse and linking building |
|
Details |
|
|
Features |
|
|
Location |
Oldham |
|
Jackson's Wharf public house and restaurant |
|
|
Farcourt Client |
White Young (Manchester) |
|
Farcourt Deliverables |
Design of three-storey steelframed structure with pitched tiled roof and composite construction floors. Foundations comprised mass concrete strips and pads. |
|
Mother Client |
|
|
Project Value |
£1.5 million |
|
Development Purpose |
Commercial Leisure |
|
Details |
|
|
Features |
|
|
Location |
Castlefield |
Previous
|
The Beacons, business Park |
|
|
Farcourt Client |
White Young (Manchester) |
|
Farcourt Deliverables |
Design of 2 three-storey steelframed structure with pitched tiled roof and composite construction floors. Foundations comprised mass concrete strips and pads. |
|
Mother Client |
Taylor Woodrow Ltd. |
|
Project Value |
£3.1m |
|
Development Purpose |
|
|
Details |
|
|
Features |
Full-height glazed elevations |
|
Location |
Birchwood, Warrington |
|
Acoustic Fatigue Facility |
|
|
Farcourt Client |
PARKMAN (Manchester office) |
|
Farcourt Deliverables |
Design of heavy reinforced concrete/masonry research laboratory with integral plant rooms, control centre and assembly area |
|
Mother Client |
British Aerospace |
|
Project Value |
£1.2 million |
|
Development Purpose |
Aircraft structural acoustic research |
|
Details |
|
|
Features |
|
|
Location |
Warton, Lancashire |
Back to Project Listing Previous
Next
|
Granada Community Challenge Gun-Run project |
|
|
Farcourt Client |
PARKMAN (Manchester office) |
|
Farcourt Deliverables |
Design of steel-framed sports hall with feature curved trussed roof and two-storey steel-framed amenity block incorporating grandstand seating for 250 people. |
|
Mother Client |
NORWEB plc Charitable Trust. |
|
Project Value |
£1.0 million |
|
Development Purpose |
An inner-city regeneration project |
|
Details |
|
|
Features |
|
|
Location |
Miles Platting, Manchester |
Next
|
Waste incinerator |
|
|
Farcourt Client |
PARKMAN (Manchester office) |
|
Farcourt Deliverables |
Design of new high-bay portalized steel frame/masonry block structure - itself adapted and refurbished as part of the works. Concrete work included A/C reception pits, chimney base and all external hardstandings. |
|
Mother Client |
Trinco Ltd |
|
Project Value |
£2.5 million |
|
Development Purpose |
Industrial process plant for the incineration of hospital waste materials. |
|
Details |
|
|
Features |
|
|
Location |
Wrexham |
Previous
|
Project |
ELSI (East London Sludge Incineration) |
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Design of steelwork for main 11.0m level and 22.0m level floors, conveyor and large-bore support structures plus all maintenance access platforms for each project. Farcourt duties included supervision of small draughting team and checking Fabricator's drawings |
|
Mother Client |
Thames Water Utilities |
|
Project Value |
£137 million the pair |
|
Development Purpose |
Sewage process plants (to replace river and sea dumping) |
|
Details |
|
|
Features |
|
|
Location |
Projects at Beckton and Crossness |
Back to Project Listing Previous
|
Project |
|
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Design of roof steelwork structure (on precast concrete building frame), atrium and link bridge with feature flying staircase |
|
Mother Client |
|
|
Project Value |
£12 million |
|
Development Purpose |
Prestigious two-storey office development |
|
Details |
|
|
Features |
|
|
Location |
Chester |
Back to Project Listing Previous
|
Manchester Airport Superhub |
|
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Two-storey steel-framed Pier "B" West on piled foundations. Work encompassed feasibility design and checking Fabricator's structural design and drawings to a fast track programme. |
|
Mother Client |
Manchester Airport Authority |
|
Project Value |
£2.7m |
|
Development Purpose |
Expansion of passenger handling facility |
|
Details |
|
|
Features |
|
|
Location |
Cheshire |
|
Size mix and Chiller Process plant. |
|
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Design and drawing work for all vessel support structures and pipework gantries, and site survey work. |
|
Mother Client |
Owens Corning Fiberglas |
|
Project Value |
£0.2m |
|
Development Purpose |
Refurbishment of fibreglass process plant |
|
Details |
|
|
Features |
|
|
Location |
Wrexham |
Next
|
Dock Facilities |
|
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Design of dock RC retaining walls. Adaptation to existing structure to accommodate new loading gates. |
|
Mother Client |
Thorntons |
|
Project Value |
£0.4m |
|
Development Purpose |
Confectionery distribution warehouse |
|
Details |
|
|
Features |
|
|
Location |
Belper |
Back to Project Listing Previous
Next
|
Silver reclamation process plant. |
|
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Design of steelwork frame for tender |
|
Mother Client |
Ilfords |
|
Project Value |
£0.5m |
|
Development Purpose |
Two-storey extension for new plant |
|
Details |
|
|
Features |
|
|
Location |
Mobberley |
Back to Project Listing Previous
|
Project |
|
|
Farcourt Client |
AMEC DESIGN & MANAGEMENT, Sale |
|
Farcourt Deliverables |
Refurbishment & adaptation of existing reinforced concrete frame building |
|
Mother Client |
Kelloggs |
|
Project Value |
£0.3m |
|
Development Purpose |
Production of breakfast cereals |
|
Details |
|
|
Features |
|
|
Location |
Trafford Park |
|
Morrison Supermarket complex |
|
|
Farcourt Client |
HUTTER JENNINGS & TITCHMARSH (CONSULTANTS), Leeds. |
|
Farcourt Deliverables |
Principally work covered the design of all outlying portal frame industrial units, supermarket warehouse and loading dock area, plus support role in other aspects such as small atrium, overall masonry design, ground slabs etc. within the main retail areas. |
|
Mother Client |
Morrison Supermarkets Ltd. |
|
Project Value |
£19 million. |
|
Development Purpose |
Development of a 65-acre shopping, retail and business park site. |
|
Details |
|
|
Features |
Comprising supermarket, retail shopping mall with integral conference facilities and high-tech micro-workshops plus industrial sector. |
|
Location |
Morton Park, Darlington |
|
Project |
|
|
Farcourt Client |
HUTTER JENNINGS & TITCHMARSH (CONSULTANTS), Leeds. |
|
Farcourt Deliverables |
Design of 2 steelwork tied portal frame buildings on pad foundations |
|
Mother Client |
Shoprite |
|
Project Value |
£450,000 |
|
Development Purpose |
|
|
Details |
|
|
Features |
The sloping site necessitated the inclusion of RC retaining walls with the design solution. |
|
Location |
Chatsworth Park, Barrow-in-Furness |
|
Deepdale Pavilions |
|
|
Farcourt Client |
SLEATER & WATSON (CONSULTANTS), Preston. |
|
Farcourt Deliverables |
Design and drawing work for: (a) Phase I: sixty 3 - 4 bedroom terraced and semi-detached houses, and (b) Phase II: refurbishment and conversion of existing infirmary building into single persons' flats. |
|
Mother Client |
Condon Construction |
|
Project Value |
£l.5 million. |
|
Development Purpose |
Housing Development on former Hospital site |
|
Details |
|
|
Features |
|
|
Location |
Preston |
|
City Park, Cornbrook |
|
|
Farcourt Client |
DERRICK WADE & WATERS (ACER GROUP of Consultants), Preston |
|
Farcourt Deliverables |
Three-storey steel-framed office block and portal frame warehouse. Work included all design calculations; and G.A. drawings prepared using AutoCAD. |
|
Mother Client |
Ryedale Properties |
|
Project Value |
£2.2m |
|
Development Purpose |
|
|
Details |
|
|
Features |
|
|
Location |
Manchester |
|
Ecumenical Church |
|
|
Farcourt Client |
NOREAST BUILDING MANAGEMENT, Leeds (Formerly P.S.A. North East Region) |
|
Farcourt Deliverables |
All design calculations and G.A. drawings produced for tender purposes. |
|
Mother Client |
R.A.F. |
|
Project Value |
£0.25m |
|
Development Purpose |
|
|
Details |
Steel frame on pad foundations with infill masonry walls |
|
Features |
Multi-faceted roof profile |
|
Location |
Leeming, Yorkshire |
Previous
|
Preston Crown Courts |
|
|
Farcourt Client |
CURTINS plc (Consultants), Manchester |
|
Farcourt Deliverables |
Design and preparation of details for 350 tonnes of roof steelwork portion of project for tender purposes. |
|
Mother Client |
|
|
Value |
£20 million |
|
Development purpose |
Regional Crown Courts |
|
Details |
|
|
Features |
40m steelwork dome over entrance foyer |
|
Location |
Preston |
|
Project |
|
|
Farcourt Client |
Simon Holder Ltd., Bury (Simon Carves Group) |
|
Farcourt Deliverables |
Production of steelwork and R.C. drawings |
|
Mother Client |
|
|
Value |
|
|
Development purpose |
Extension/refurbishment of paper mill |
|
Details |
|
|
Features |
Drawings carried out to American standards and methods. |
|
Location |
Jacksonville Florida U.S.A. |
Next
|
Project |
|
|
Farcourt Client |
L. G. MOUCHEL & PARTNERS, Manchester |
|
Farcourt Deliverables |
Foundation design and Q.A. fabricator’s package |
|
Mother Client |
Hospital Board |
|
Value |
£0.3m |
|
Development purpose |
New Energy Centre and administration and food preparation buildings. |
|
Details |
|
|
Features |
|
|
Location |
Bradford |
|
YMCA Building |
|
|
Farcourt Client |
L. G. MOUCHEL & PARTNERS, Manchester |
|
Farcourt Deliverables |
Quality Assurance of main structural calculations & stairs towers. Design of fives courts. Q.A. fabricator’s package. |
|
Mother Client |
YMCA |
|
Value |
£4.5m |
|
Development purpose |
Four-storey hotel & sports complex |
|
Details |
|
|
Features |
|
|
Location |
Castlefield, Manchester. |
|
Project |
|
|
Farcourt Client |
DEAKIN CALLARD & PARTNERS, Manchester |
|
Farcourt Deliverables |
Design of new atrium. Adaptations of existing R.C. frames. |
|
Mother Client |
Grafton Developments |
|
Value |
£2m |
|
Development purpose |
Refurbishment of shopping mall and multi-storey car park |
|
Details |
|
|
Features |
Included provision of new atrium. |
|
Location |
Blackpool |
|
Project |
|
|
Farcourt Client |
BABCOCK CONTRACTORS Ltd., Rochdale |
|
Farcourt Deliverables |
Adaptation of existing shell building. Strengthening of existing conveyor structures. Design of secondary plant structures. Modernisation & extension of existing limestone process/cement plant |
|
Mother Client |
British Steel |
|
Value |
£8m |
|
Development purpose |
Provision of cone vessels and conveyor structures. |
|
Details |
|
|
Features |
|
|
Location |
Shap Fell Quarries, Cumbria |
|
Project |
|
|
Farcourt Client |
BABCOCK CONTRACTORS Ltd., Rochdale |
|
Farcourt Deliverables |
Feasibility proposals & preliminary design of structures & plant support |
|
Mother Client |
Steetley Quarries Ltd. |
|
Value |
|
|
Development purpose |
Bulk gravel screening and washdown process buildings. |
|
Details |
|
|
Features |
|
|
Location |
Derbyshire |
|
Project |
|
|
Farcourt Client |
BABCOCK CONTRACTORS Ltd., Rochdale |
|
Farcourt Deliverables |
Design checks to existing steelwork gantries and R.C. bunkers. |
|
Mother Client |
British Coal |
|
Value |
£1.4m |
|
Development purpose |
Provision of bulk coal storage & grading |
|
Details |
|
|
Features |
Automated conveyor system |
|
Location |
Daw Mill Colliery, Yorkshire |
http://www.Farcourt.co.uk/
Telephone FARCOURT LTD. on 01706 852050